HomeAboutServicesParticipationTechnology & QualityService AreaCareersContact

XIN-LI TECHNOLOGY ENGINEERING

ENGINEERING
THE FLOW.

Precision in every connection.

SEMICONDUCTOR FACILITY PIPING
CHEMICAL / UPW / DRAIN / CDA / HOOK UP

TAIWAN × JAPANSCROLL TO EXPLORE ↓PRECISION. SAFETY. TRUST.

01 / OUR EXPERTISE

Plastic Piping and Equipment Secondary Piping

Focused on semiconductor facility engineering — site measurement, off-site prefabrication, on-site installation and adjustment, and the removal and re-routing of existing lines.

About Xin-Li →
10+YearsCore Team Industry Experience
50+Cumulative Company Projects
TAIWAN × JAPANService Area

50+ cumulative company projects; 33 documented records are currently shown on this website. Some historical projects are not listed individually because their records are incomplete.

02 / OUR SERVICES

From facility piping to equipment connections

03 / ENGINEERING SUPPORT AREAS

TAIWAN × JAPAN

Our main base is in Taichung; in Japan, Kumamoto and Hiroshima are our engineering support areas. Work in other regions can be discussed.

01 / TAIWANTAICHUNG02 / JAPANKUMAMOTO03 / JAPANHIROSHIMA
ENGINEERING SUPPORT AREAS

04 / PROJECT EXPERIENCE

Engineering experience in Taiwan and Japan

We participate in semiconductor facility construction and equipment installation through upstream contractors and specialist partners.

Facility exterior photographs provide location context; they are not photographs of our installed piping.

SEMICONDUCTOR FACILITY PIPING
TSMC Fab 12A / Hsinchu / Facility exterior

PROJECT EXPERIENCE / 01

TSMC Hsinchu F20 Fab

WCCS Process Piping — New Construction

Took part in new WCCS process piping, covering process piping, pressure testing and final acceptance.

View project experience
SEMICONDUCTOR FACILITY PIPING
JASM / Kumamoto / Facility exterior

PROJECT EXPERIENCE / 02

JASM, Kumamoto, Japan

Facility Piping

Took part in facility piping at the JASM site in Kumamoto, Japan, covering chemical, UPW and drainage piping layout and installation.

View project experience
SEMICONDUCTOR FACILITY PIPING
Micron / Hiroshima / Facility exterior

PROJECT EXPERIENCE / 03

Micron MTB, Taichung

Tool PP Header and Final Connection Piping

Took part in machine PP headers, final connection piping and sampling point layout, together with removal of existing plastic piping.

View project experience

05 / TECHNOLOGY & QUALITY

Care at every stage

Material selection, installation and testing guided by project requirements and owner specifications.

  1. Materials and methods selected for the system requirements
  2. Prefabrication and installation adapted to site conditions
  3. Quality inspections, pressure and leak testing to specification
Explore materials, methods and quality

06 / OUR PARTNERS

Working with specialist partners

Japan Partners

JOIN THE TEAM

Build the next connection with us.

Careers

NEXT / YOUR PROJECT

Tell us about your project

Share your site location and scope. We will connect you with the right contact.