01
Chemical Piping Systems
Process piping planning, installation and testing for the semiconductor and high-tech industries.
Scope
Acid & Alkali Transfer SystemsPP Piping SystemsPVDF Piping SystemsPVC Piping SystemsCPVC Piping Systems
ServicesSERVICES
Chemical piping, process utilities, equipment Hook-Up, engineering management, quality testing and new-build or expansion run in parallel — each assessed per system or per project stage.
Core Expertise
With plastic piping at the core, we provide off-site prefabrication, on-site installation, line adjustment and equipment secondary piping.
Material is selected against the fluid type, concentration and temperature.
Explore Piping Materials and FittingsIllustrated notes on the six plastic piping materials and their fitting forms are collected on the Technology & Quality page.
Six methods, from measurement through to removal and re-routing of existing lines.
Chemical piping, process utilities, equipment Hook-Up, engineering management, quality testing and new-build or expansion work all continue alongside it. Other trades are assessed per project and delivered with partner resources.
Service Lines
Grouped by system and by project stage — each system or stage can be assessed on its own.
01
Process piping planning, installation and testing for the semiconductor and high-tech industries.
Scope
Acid & Alkali Transfer SystemsPP Piping SystemsPVDF Piping SystemsPVC Piping SystemsCPVC Piping Systems02
Process utility system construction carried out to customer requirements.
Scope
Process Utility SystemsUPW (Ultra Pure Water)DRAIN SystemsCDA (Clean Dry Air)Chemical Supply Systems03
Piping, wiring and system connection services for semiconductor manufacturing equipment after installation.
Scope
System IntegrationEquipment Secondary PipingEquipment Utility Connections04
Project management services covering everything from project planning to final acceptance.
Scope
Final AcceptanceProject PlanningSite Construction ManagementSchedule ControlMulti-vendor Coordination05
Standardized quality control procedures that keep construction quality aligned with client specifications.
Scope
Quality InspectionPressure TestingLeak TestingSystem TestingFinal Acceptance06
Experience in semiconductor facility new-build and expansion construction.
Scope
Shutdown WorksNew ConstructionFacility ExpansionEquipment AdditionSystem ModificationProcess
Every project follows the same sequence, with defined checkpoints at each stage.
Tell us your project needs and site location. We will assign the appropriate sales contact to follow up with you.